-
Drawings and permits
First the lines. Then the house.
We build villas on Aruba’s cunucu land. Follow one from bare ground to its first night with the lights on.
-
Rebar and concrete
Foundation
Rebar tied, slab poured, then the concrete gets time to cure before anything goes on top.
-
Block and columns
Walls
Concrete block and steel-reinforced columns, the way houses go up on this island.
-
Formwork and pour
Roof
A poured concrete slab on beams, propped from below until it can carry its own weight.
-
Plaster, glass and wood
Finishes
White stucco walls, wide glass doors, a timber pergola over the terrace, terracotta at the steps.
-
Handover
Home
The pool is full, the palms are in and the lights are on. Time to hand over the keys.
-
Want this for your company?
Aruba Webstudio makes sites like this for builders, contractors and real estate agents in Aruba.
Message Aruba Webstudio